Skip to main content

Projects

SilentShip

Ongoing
since 2024

The project “SilentShip – Acoustic Black Holes, a new frontier for silent ships” aims to improve cabin comfort and the vibro-acoustic footprint of the ship in water by means of purpose-designed Acoustic Black Holes (ABH) in a me

Glue2Nav

Ongoing
2026–2028

The Glue2Nav project aims to develop a family of integrated mounting brackets designed to replace the conventional welded attachment of ship outfitting components to the hull of cruise ships.

Rumair & Rumair II

Completed
2020–2024

The RumAir and RumAir II projects, carried out in 2020 and 2024, studied the external acoustic field generated by a cruise ship in port and under way, using a predictive numerical simulation model based on the ray-t

Glu&Nav

Completed
2019–2020

The Glu&Nav project concerned the study and development of new non-structural bonding systems for systems and outfitting on board large cruise ships.

Silegant

Completed
2020–2021

Development and production of a new concept of class B fire door for luxury yachts and mega-yachts, featuring a high degree of sound insulation and a refined design.

ConfCab

Completed
2018–2020

The ConfCab project (Silent cabin on floating floors and decoupled decks) aimed at developing, testing and validating systems (floors, panels, struts) able to reduce the noise and vibration perceived in the cabin while increasin

WaveDC

Completed
2019–2020

The WaveDC project assessed the use of a new methodology for the longitudinal strength analysis of a cruise ship by direct calculation on a FEM model.