Skip to main content

Glu&Nav

Completed
2019–2020

The Glu&Nav project concerned the study and development of new non-structural bonding systems for systems and outfitting on board large cruise ships.

Rumair & Rumair II

Completed
2020–2024

The RumAir and RumAir II projects, carried out in 2020 and 2024, studied the external acoustic field generated by a cruise ship in port and under way, using a predictive numerical simulation model based on the ray-t

SilentShip

Ongoing
since 2024

The project “SilentShip – Acoustic Black Holes, a new frontier for silent ships” aims to improve cabin comfort and the vibro-acoustic footprint of the ship in water by means of purpose-designed Acoustic Black Holes (ABH) in a me